Kudankulam unit 2 begins commercial operation

PTI Feeds
Cannes, May 22 (PTI) Sonam Kapoor showed off her another iconic look from Cannes fashion diaries as the actress slayed the gala’s red carpet in a striking Elie Saab ensemble. This is 31-year-old actress’ seventh year at the French Riveria and she made sure that her outfit stood out from the rest. The diva appeared […]
Kudankulam unit 2 begins commercial operation

New Delhi, Mar 31 (PTI) The second unit of Kudankulam Nuclear Power Plant Project (KKNPP) with a capacity of 1000 MW became operational today, giving a boost to the atomic power generation in the country.

Commercial operation of KKNPP unit 2 is expected to take total nuclear power to 6,780 MW. The unit was connected to the grid on August 2.

The KNPP units 1 and 2, both with a capacity of 1000 MWs, have been built with Russian collaboration.

This is published unedited from the PTI feed.